Concrete Products Award 2020. Verified penalty rates, shift loadings, leave loading and RDO arrangements, with a live calculator under the NES.
| Component | Formula | Value |
|---|---|---|
| Accrual rate (FULL-TIME) | 4 wks × 38h ÷ 52 | 2.923 hrs/wk |
| Hours accrued | 2.923 × 52 wks | 152.42 hrs |
| Hourly base rate | - | $35.00 |
| Base leave value | 152.42 × $35.00 | $5,334.62 |
| 17.5% leave loading | base × 0.175 | + $933.56 |
| Total payout | - | $6,268.17 |
Disclaimer: This tool does not constitute legal or financial advice. Results may be inaccurate due to changes in legislation or your circumstances. This tool does not constitute legal or financial advice. We do not recommend taking actions based solely on these results. The calculator makes assumptions and results may be inaccurate due to changes in legislation, modern awards, or your personal circumstances. You use this information at your own risk. We can't guarantee to be perfect, so do note you use the information at your own risk and we can't accept liability if things go wrong. For official guidance, visit Fair Work Ombudsman (fairwork.gov.au). Fair Work Ombudsman.
Dollar rates effective from 1 July 2026 after the Annual Wage Review increase. Penalty rates verified against the MA000056 award text.
What each hour is worth as a percentage of the base rate, for permanent and casual employees.
5 levels, measured from $0 so the gaps between them are true to scale.
Grey bars fall below the adult national minimum wage. The award itself sets these rates, and the key below says who each one applies to.
Lifted each year by the Annual Wage Review. Up 23.7% since FY2023. Percentages are the movement in the NMW itself, which exceeded the award increase in the years the Commission realigned it to the C13 rate.
Every loading in the award, side by side for full-time, part-time and casual employees.
| Hours worked | Full-time / part-time | Casual (incl. loading) |
|---|---|---|
| Ordinary hours | 100% | 125% |
| Saturday (overtime, day workers, first 2h / after) | 150% / 200% | 187.5% / 250% |
| Sunday (overtime, day workers) | 200% | 250% |
| Public holiday | 250% | 275% |
| Evening, on a shiftworker's shift finishing after 6.00pm and at or before midnight | 115% | 140% |
| Night shift | 115% | 140% |
| Permanent night shift | 125% | 150% |
| Shiftworkers, Saturday | 150% | 175% |
| Shiftworkers, Sunday | 200% | 225% |
| Shiftworkers, public holiday | 200% | 225% |
| Afternoon or night shift that does not continue, first 2 hours | 150% | 175% |
| Afternoon or night shift that does not continue, after 2 hours | 200% | 225% |
All values are percentages of the base hourly rate. Casual rates shown are inclusive of the 25% casual loading on top of the FT/PT rate. For your own dollar amounts, use the FWO Pay Calculator.
These are the percentages. To turn them into dollars for a specific roster, the penalty rates calculator prices Saturday, Sunday, public holiday and shift hours against this award’s own classification rates.
Weekly rates are for 38 ordinary hours. Casual hourly includes the 25% loading.
| Level | Classification | Weekly rate | Hourly rate | Casual hourly |
|---|---|---|---|---|
| Level 1 | Level 1 (Schedule A.1) | $978.10 | $25.74 | $32.18 |
| Level 2 | Level 2 (Schedule A.2) | $1,004.90 | $26.44 | $33.05 |
| Level 3 | Level 3 (Schedule A.3) | $1,029.10 | $27.08 | $33.85 |
| Level 4 | Level 4 (Schedule A.4) | $1,062.90 | $27.97 | $34.96 |
| Level 5 | Level 5 (Schedule A.5) | $1,119.10 | $29.45 | $36.81 |
Rates effective from 1 July 2026 after the Annual Wage Review increase. Weekly rates are for 38 ordinary hours. Casual rates include the 25% loading on top of the hourly rate. Source: the MA000056 award text as consolidated to 1 July 2026.
Hourly and casual hourly rates above exclude the industry allowance of $29.34 a week ($19.56 in a factory whose sole purpose is making tiles), which is paid for all purposes (clause 18.2(b)), so it sits inside the ordinary hourly rate that every penalty, overtime rate and the casual loading are calculated on.
Paid on top of the base rate. Amounts effective from 1 July 2026.
| Allowance | Amount | Frequency | Notes |
|---|---|---|---|
| Industry allowance | $29.34 | per week | Clause 18.2(b)(i). Paid for all purposes, so it sits inside the ordinary hourly rate that every penalty, overtime rate and the casual loading are calculated on. The hourly and casual rates above exclude it. Schedule B.2.1 prints the ordinary hourly rate as $26.51 at Level 1, $27.21 at Level 2, $27.85 at Level 3, $28.74 at Level 4 and $30.22 at Level 5, and Schedule B.4.1 prints the casual ordinary hourly rate as $33.14, $34.01, $34.81, $35.93 and $37.78. |
| Industry allowance, tile factories | $19.56 | per week | Clause 18.2(b)(ii), instead of the $29.34 for employees in a factory whose sole purpose is making tiles. Also paid for all purposes. The award prints no hourly rate table for these employees. |
| Leading hand allowance | $28.36 - $44.99 | per week | Clause 18.2(e). $28.36 in charge of less than 3 employees, $37.17 for 3 to 6, $44.99 for more than 6. A leading hand gets this on top of their own rate, or the rate for the highest class of work supervised, whichever is higher. |
| First aid allowance | $3.91 | per day | Clause 18.2(d), when appointed to perform first aid duty in addition to ordinary duties. |
| Cement or concrete allowance | $0.77 | per hour | Clause 18.2(c), for time actually spent in tanks containing water while working with cement or concrete articles, paid for a minimum of 4 hours. |
| Bituminous, epoxy and sand-blasting allowances | $0.77 - $1.21 | per hour or part hour | Clause 18.2(f). $0.77 spraying or using bituminous and similar preparations on exterior surfaces, $1.21 preparing or applying epoxy based materials, $1.21 using a sand-blasting machine. |
| Fork-lift operators allowance | $6.31 | per week | Clause 18.2(g), where 2 or more fork-lifts or cranes are engaged in one lift, paid to the fork-lift drivers for the time so occupied. Schedule C.1.2 calculates it as 24.5% of the standard hourly rate but the award expresses it per week. |
| Meal allowance | $20.52 | per meal | Clause 18.3(a), for more than 2 hours of work beyond ordinary hours without notice on the previous day or earlier, where no meal is supplied. |
| Accommodation allowance | $119.91 or $838.85 | per day, then per week | Clause 18.3(b), where you cannot return home the same night and board and lodging are not provided: $119.91 a day for the first 7 days, then $838.85 for each later week or part week. |
| Boot and clothing allowances | $3.29 and $2.67 | per week | Clauses 18.3(d) and 18.3(e). Each is one of three options chosen by agreement between the employer and the majority of employees; the others are issued or employer-owned boots and clothing. |
| Loss of clothing | up to $766.88 | maximum reimbursement | Clause 18.3(f), for clothing destroyed by fire in a changing house or other shelter, unless the employee caused it. |
Set by Concrete Products Award 2020 (MA000056) and the NES.
Where this award goes beyond, or sits at, the NES floor.
A 7 day shiftworker who is regularly rostered to work on Sundays and public holidays gets a 5th week of annual leave under section 87(1)(b) of the Act (clause 22.2). Their excessive leave accrual threshold is 10 weeks instead of 8 (clause 22.7(a)). This is a different test from "continuous work" in clause 2, which sets shift hours and overtime rates.
Day workers are paid what they would have earned for their ordinary hours, AND a flat 17.5% loading on top. Shift workers are paid what they would have earned for their ordinary hours, AND the greater of 17.5% or their shift penalty on top. This award adds the pay and the loading rather than paying the greater of them. The 17.5% is calculated on your ordinary hourly rate, which already includes the all-purpose industry allowance, plus the leading hand and first aid allowances where they apply (clause 22.3(b)). Run the numbers in the annual leave loading calculator.
One of the ways the 38 hour week can be worked, by agreement with the majority of affected employees, is a rostered day off in each 20 day work cycle with 8 hours on each of the other 19 days (clause 13.3(b)(iii)). The employer nominates the RDO and gives at least 7 days notice (clause 14.1(a) and (d)), can require up to 5 RDOs to be accrued, each to be taken within 12 months of its due date (clause 14.1(e) and (f)), and each 4 weeks of annual leave counts as accruing and taking an RDO (clause 14.1(h)). Working an RDO is paid 150% for the first 2 hours then 200% (clause 20.4).
The Concrete Products Award sets your pay rates, but your paid leave runs on the National Employment Standards. Work out 4 weeks of holidays with the annual leave calculator, and your 10 days of paid sick and carer's leave with the personal leave calculator. To confirm which award applies to you and how it lifts entitlements above the NES floor, read our guide to modern awards.
The Concrete Products Award (MA000056) is the common name for the Concrete Products Award 2020. Industries, work types and exclusions are taken from the Fair Work Ombudsman summary.
Notes & exclusions. Day workers and shiftworkers are paid differently on weekends and public holidays. A day worker's ordinary hours are Monday to Friday between 6.00am and 6.00pm (clause 13.2(a)), so their Saturday and Sunday work is overtime: 150% for the first 2 hours then 200% on a Saturday and 200% all day Sunday, with a 4 hour minimum (clauses 20.2 and 20.3). That is what the Saturday and Sunday rows of the penalty table on this page show. A day worker on a public holiday gets 250% (clause 27.3). A shiftworker gets 150% on a Saturday (clause 21.7) and 200% on a Sunday or a public holiday (clause 21.9), so a shiftworker is paid less than a day worker on a public holiday. Afternoon and night shifts are both 115%. A night shift worked by someone on night shift only, or for more than 4 consecutive weeks, or without rotating to give at least a third of working time off night shift, is 125%. A shift that does not continue for at least 5 successive afternoons or nights in a 5 day workshop (6 in a 6 day workshop), or for the ordinary hours of an alternative arrangement, is 150% for the first 2 hours then 200% (clause 21.6). Weekend, public holiday and overtime rates replace the shift loading rather than adding to it (clause 21.10). Every percentage is applied to the ordinary hourly rate, which includes the all-purpose industry allowance (clause 2): $29.34 a week in most of the industry, but $19.56 in a factory whose sole purpose is making tiles (clause 18.2(b)), and the award prints no rate table for tile factory employees. Casual penalties add the 25% loading (Schedule B.4), but casual overtime compounds it, so a casual day worker gets 187.5% then 250% on a Saturday and 250% on a Sunday (clause 20.2), while a casual shiftworker gets 175% on a Saturday and 225% on a Sunday (Schedule B.4.2). Casuals are paid for at least 4 hours on each day they are engaged (clause 11.3). Annual leave pay is what you would have earned for your ordinary hours plus the greater of a 17.5% loading or, for a shiftworker, the shift penalty (clause 22.3). Level 1 ($978.10 a week) is below the National Minimum Wage and cannot last more than 6 months (Schedule A.1.1). The award has no vehicle allowance and no junior or apprentice rates. A precast yard or batch plant at a construction site for civil construction work is covered by the Building & Construction Award instead (MA000020 clause 4.3(b)(v)).
Each classification has its own pay grade. Use the FWO Pay Calculator for current dollar rates.
Penalty rates, leave entitlements and award-specific provisions under MA000056. Verified against the modern award text.
Penalty rates, shift loadings and continuous-shift eligibility on this page were verified against Concrete Products Award 2020 (MA000056) on the Fair Work Commission's awards.fairwork.gov.au.
For up-to-date pay rates by classification, refer to the FWO Pay Calculator. Modern awards are reviewed and varied periodically by the Fair Work Commission; check the source for the latest text.